PM Surya Ghar Empanelled · Up to ₹78,000 Direct Bank Subsidy (PVVNL Desk)
DELHI-NCR ROOFTOP SHOWROOM

Select your city

Personalize local DISCOM net-metering guidance across packages and calculators. Choosing a city never opens a form.

INDICATIVE SOLAR ESTIMATE

Plan Your
Solar Savings.

Compare an indicative system size and cost using the assumptions below. Ask the team for a site assessment and reviewed quotation.

ROI Control

Asset Class
System Configuration

Estimated Costs & Monthly Savings

Up to ₹78,000 Govt Subsidy
Recommended Capacity 5.0 kW
Est. Investment ₹ 2.5L
Subsidy ₹ 78k
Annual Save ₹ 48k
Payback 3.2 Y

Constant-tariff gross projection; excludes maintenance, replacements, degradation and financing. Subsidy is subject to approval.

25-year gross projection ₹ 24.5L
Model assumptions & PM Surya Ghar regulatory terms (Official Portal: pmsuryaghar.gov.in)

120 units/kW/month; the selected regional tariff is indicative. Base equipment cost is ₹60,000/kW before roof adjustments. Savings are capped at your bill; fixed charges may remain. State subsidy additions are excluded. EMI uses an illustrative 10.5% annual rate, not a loan offer. PM Surya Ghar central CFA (1 kW: ₹30,000, 2 kW: ₹60,000, 3 kW+: ₹78,000 flat cap for MNRE ALMM + DCR residential systems) applies to grid-connected On-Grid systems (which shut down during outages for anti-islanding safety) and Hybrid systems with LiFePO4 battery backup using a DISCOM-approved hybrid inverter. Non-governmental estimate · Official Portal: pmsuryaghar.gov.in.

Recommended Capacity 5.0 kW
Investment ₹ 2.5L
MNRE-Listed Channel Partner Central subsidy, end to end
Project updates in one place Customer portal and support
25-Year Module Warranty Tier-1 hardware only
24-Hour Response Protocol Service, app-monitored
QUICK ANSWERS

Questions, Answered.

Straight answers from our engineers - no jargon, no sales speak.

How accurate is the Varka solar ROI calculator? +

This is an indicative estimate using stated generation, tariff and equipment-cost assumptions. It is not connected to live meter, tariff or weather data. A site survey and reviewed quotation are required.

What data do I need to use the calculator? +

You need your monthly electricity bill amount, approximate rooftop area, and your city. Optionally, your sanctioned load and panel orientation improve accuracy.

Does the calculator account for subsidy? +

Yes — PM Surya Ghar central CFA (₹30,000 for 1 kW, ₹60,000 for 2 kW, and capped flat at ₹78,000 for 3 kW+ MNRE ALMM + DCR residential grid-connected systems) is shown separately and credited post-commissioning via DBT. State additions are excluded. Official Portal: pmsuryaghar.gov.in.

What system size do I need for my bill? +

As a rule of thumb, every 1kW of solar offsets roughly \u20b91,100-1,400 of monthly bill in NCR. The calculator sizes your plant from your bill; a 10kW system typically zeroes a \u20b910,000-12,000/month bill during sun hours.

Is the estimate a firm quote? +

No. The result is an indicative model. A reviewed quotation must account for equipment, structure, shading, sanctioned load and DISCOM requirements.

What happens after I calculate my estimate? +

You can share the result with us in one click - an engineer then runs the feasibility check and calls you within one business day with the confirmed system design and subsidy-adjusted pricing.

Browse the full Knowledge Base →
CLIENT STORIES

Homeowners who made the smart switch.

Experiences shared by our customers.

★★★★★

“Varka delivered our 12kW Gurgaon plant in 21 days, including all DISCOM paperwork. Generation has matched the 3D simulation at 99.2%.”

R
Rahul Malhotra Gurgaon 12kW Solar
★★★★★

“The 45kW rooftop on our factory has cut our grid bill by 78%. Their team handled accelerated depreciation documentation too.”

M
Meera Krishnan Noida 45kW Solar
★★★★★

“Clean installation, professional engineers. Net metering took a bit longer than promised but support stayed with us throughout.”

A
Aman Verma Delhi 6kW Solar
FREE SITE AUDIT & SUBSIDY ESTIMATE

Your roof is earning nothing.
Let’s change that.

Get a free engineering audit, a site-specific savings estimate, and the maximum MNRE subsidy you qualify for. Timelines depend on site assessment. No obligation.