PM Surya Ghar
Subsidy Protocol.
Absolute clarity on PM Surya Ghar: Muft Bijli Yojana. We handle the technical compliance and paperwork for your direct-to-bank subsidy of up to ₹78,000.
Govt. Approved
Varka Solar is a verified MNRE partner for residential solar subsidies across all states.
Sovereign Grant Matrix.
1 kW - 2 kW
Direct subsidy of ₹30,000 to ₹60,000. Ideal for small rooftops (100-200 sq.ft) with monthly bills under ₹3,000.
3 kW Core
Flat subsidy of ₹78,000. Our most popular engineering bracket for 3BHK/4BHK homes in Delhi-NCR.
RWA / Society
Subsidy of ₹18,000 per kW capped at 500kW. Dedicated for common area lighting and lifts.
Required Documentation.
- ✓ Latest Electricity Bill (Must match Aadhar name)
- ✓ Aadhar Card (Linked with Mobile Number)
- ✓ Property Ownership Document / Tax Receipt
- ✓ Rooftop Site Photo (Pre-installation)
- ✓ Cancelled Cheque (For direct DBT transfer)
DISCOM Liaison.
Varka Solar maintains dedicated liaison desks for NCR utilities to ensure zero-friction approval cycles.
PM Surya Ghar Direct-to-Bank CFA Matrix (MNRE ALMM + DCR)
| System Capacity | Subsidy per kW | Total Govt. Support | Varka Install Estimate |
|---|---|---|---|
| 1.0 kWp | ₹30,000 | ₹30,000 | ₹55,000 - ₹65,000 |
| 2.0 kWp | ₹30,000 | ₹60,000 | ₹1,05,000 - ₹1,15,000 |
| 3.0 kWp to 10 kWp | ₹18,000 (Addl) | ₹78,000 (Capped) | ₹1,65,000 onwards |
On-Grid vs. Hybrid eligibility: Both On-Grid systems (which automatically shut down during grid outages for anti-islanding safety) and Hybrid systems with LiFePO4 battery backup qualify for central CFA (₹30,000 for 1 kW · ₹60,000 for 2 kW · capped flat at ₹78,000 for 3 kW+) only when built with MNRE ALMM + DCR residential modules and, for Hybrid plants, a DISCOM-approved hybrid inverter for net-metering. Non-governmental educational guide · Official Portal: pmsuryaghar.gov.in
Why 15% of Subsidies
are Rejected.
Small technical errors in the National Portal often lead to permanent subsidy rejection. Varka Solar's Liaison Desk audits your profile before the DISCOM inspection.
The Varka Advantage.
We don't just install solar; we secure your grant. Our internal portal tracks your subsidy status from DISCOM feasibility to DBT release.
The Varka
Assurance Protocol.
We handle your PM Surya Ghar portal KYC and feasibility request via the National Portal.
Installation of MNRE-approved components (ALMM List) which is mandatory for subsidy disbursement.
We coordinate the joint inspection with DISCOM officials for Net Meter commissioning.
Eligible for ₹78,000?
Our engineers will verify your load eligibility and rooftop feasibility within 24 hours.
Varka ID: MNRE-NCR-2026-04
Questions, Answered.
Straight answers from our engineers - no jargon, no sales speak.
What is the PM Surya Ghar subsidy structure? +
Central CFA for MNRE ALMM + DCR residential grid-connected systems: ₹30,000 for 1 kW, ₹60,000 for 2 kW, and capped flat at ₹78,000 for 3 kW or larger systems. Commercial and industrial installations are not eligible for residential CFA. Official Portal: pmsuryaghar.gov.in.
Who is eligible for PM Surya Ghar subsidy? +
Residential consumers with a valid DISCOM connection. The property must be owned. Tenant/rented properties, commercial, industrial, and institutional consumers are not eligible for central subsidy.
How does Varka handle the subsidy process? +
We manage DISCOM technical sanction, MNRE portal registration, post-commissioning inspection coordination, and follow up until subsidy is credited to your bank account.
Do I receive the subsidy upfront or after installation? +
Under PM Surya Ghar: Muft Bijli Yojana, you pay the installer per project milestones and the central CFA (up to ₹78,000) is disbursed directly via DBT into your Aadhaar-linked bank account after installation, DISCOM bi-directional net-meter commissioning, and inspection on pmsuryaghar.gov.in.
Does my property qualify? What if I live in a rented flat? +
Central subsidy requires an owned property with a residential DISCOM connection. Rented homes, societies' common areas, commercial, and industrial premises are not eligible - although commercial properties get accelerated depreciation instead, which we model for you.
Is there any state subsidy for Delhi NCR homeowners? +
In some NCR states, a limited additional state top-up exists on top of the central CFA; because it changes periodically, our engineers confirm the current slab for your city during the free audit before you commit.
Homeowners who made the smart switch.
Experiences shared by our customers.
“Varka delivered our 12kW Gurgaon plant in 21 days, including all DISCOM paperwork. Generation has matched the 3D simulation at 99.2%.”
“The 45kW rooftop on our factory has cut our grid bill by 78%. Their team handled accelerated depreciation documentation too.”
“Clean installation, professional engineers. Net metering took a bit longer than promised but support stayed with us throughout.”
Your roof is earning nothing.
Let’s change that.
Get a free engineering audit, a site-specific savings estimate, and the maximum MNRE subsidy you qualify for. Timelines depend on site assessment. No obligation.
Secure Your Solar Audit.
Share your contact & rooftop location for a free engineer survey.
Project Parameters.
Tap a preset chip or enter your bill & capacity.
Request
Received.
Your enquiry has been recorded. Sign in to your Customer Portal anytime to follow live stages, proposals, and documents.