PM Surya Ghar Empanelled · Up to ₹78,000 Direct Bank Subsidy (PVVNL Desk)
DELHI-NCR ROOFTOP SHOWROOM

Select your city

Personalize local DISCOM net-metering guidance across packages and calculators. Choosing a city never opens a form.

POLICY AUDIT

PM Surya Ghar
Subsidy Protocol.

Absolute clarity on PM Surya Ghar: Muft Bijli Yojana. We handle the technical compliance and paperwork for your direct-to-bank subsidy of up to ₹78,000.

Govt. Approved

Varka Solar is a verified MNRE partner for residential solar subsidies across all states.

TIERS

Sovereign Grant Matrix.

1 kW - 2 kW

Direct subsidy of ₹30,000 to ₹60,000. Ideal for small rooftops (100-200 sq.ft) with monthly bills under ₹3,000.

3 kW Core

Flat subsidy of ₹78,000. Our most popular engineering bracket for 3BHK/4BHK homes in Delhi-NCR.

RWA / Society

Subsidy of ₹18,000 per kW capped at 500kW. Dedicated for common area lighting and lifts.

Required Documentation.

  • ✓ Latest Electricity Bill (Must match Aadhar name)
  • ✓ Aadhar Card (Linked with Mobile Number)
  • ✓ Property Ownership Document / Tax Receipt
  • ✓ Rooftop Site Photo (Pre-installation)
  • ✓ Cancelled Cheque (For direct DBT transfer)

DISCOM Liaison.

Varka Solar maintains dedicated liaison desks for NCR utilities to ensure zero-friction approval cycles.

BSES (Delhi) 30-45 Days
PVVNL (Noida) 45-60 Days
DHBVN (Gurgaon) 40-50 Days
TPDDL (Delhi) 35-45 Days

PM Surya Ghar Direct-to-Bank CFA Matrix (MNRE ALMM + DCR)

System Capacity Subsidy per kW Total Govt. Support Varka Install Estimate
1.0 kWp ₹30,000 ₹30,000 ₹55,000 - ₹65,000
2.0 kWp ₹30,000 ₹60,000 ₹1,05,000 - ₹1,15,000
3.0 kWp to 10 kWp ₹18,000 (Addl) ₹78,000 (Capped) ₹1,65,000 onwards

On-Grid vs. Hybrid eligibility: Both On-Grid systems (which automatically shut down during grid outages for anti-islanding safety) and Hybrid systems with LiFePO4 battery backup qualify for central CFA (₹30,000 for 1 kW · ₹60,000 for 2 kW · capped flat at ₹78,000 for 3 kW+) only when built with MNRE ALMM + DCR residential modules and, for Hybrid plants, a DISCOM-approved hybrid inverter for net-metering. Non-governmental educational guide · Official Portal: pmsuryaghar.gov.in

REJECTION MITIGATION

Why 15% of Subsidies
are Rejected.

Small technical errors in the National Portal often lead to permanent subsidy rejection. Varka Solar's Liaison Desk audits your profile before the DISCOM inspection.

⚡ Name mismatch between Bill & Aadhar.
⚡ Installation using Non-ALMM Modules.
⚡ Wrong banking details on National Portal.

The Varka Advantage.

We don't just install solar; we secure your grant. Our internal portal tracks your subsidy status from DISCOM feasibility to DBT release.

WORKFLOW

The Varka
Assurance Protocol.

1
Portal Registration

We handle your PM Surya Ghar portal KYC and feasibility request via the National Portal.

2
Tier-1 ALMM Install

Installation of MNRE-approved components (ALMM List) which is mandatory for subsidy disbursement.

3
Inspectorate Coordination

We coordinate the joint inspection with DISCOM officials for Net Meter commissioning.

Eligible for ₹78,000?

Our engineers will verify your load eligibility and rooftop feasibility within 24 hours.

Varka ID: MNRE-NCR-2026-04

MNRE-Listed Channel Partner Central subsidy, end to end
Project updates in one place Customer portal and support
25-Year Module Warranty Tier-1 hardware only
24-Hour Response Protocol Service, app-monitored
QUICK ANSWERS

Questions, Answered.

Straight answers from our engineers - no jargon, no sales speak.

What is the PM Surya Ghar subsidy structure? +

Central CFA for MNRE ALMM + DCR residential grid-connected systems: ₹30,000 for 1 kW, ₹60,000 for 2 kW, and capped flat at ₹78,000 for 3 kW or larger systems. Commercial and industrial installations are not eligible for residential CFA. Official Portal: pmsuryaghar.gov.in.

Who is eligible for PM Surya Ghar subsidy? +

Residential consumers with a valid DISCOM connection. The property must be owned. Tenant/rented properties, commercial, industrial, and institutional consumers are not eligible for central subsidy.

How does Varka handle the subsidy process? +

We manage DISCOM technical sanction, MNRE portal registration, post-commissioning inspection coordination, and follow up until subsidy is credited to your bank account.

Do I receive the subsidy upfront or after installation? +

Under PM Surya Ghar: Muft Bijli Yojana, you pay the installer per project milestones and the central CFA (up to ₹78,000) is disbursed directly via DBT into your Aadhaar-linked bank account after installation, DISCOM bi-directional net-meter commissioning, and inspection on pmsuryaghar.gov.in.

Does my property qualify? What if I live in a rented flat? +

Central subsidy requires an owned property with a residential DISCOM connection. Rented homes, societies' common areas, commercial, and industrial premises are not eligible - although commercial properties get accelerated depreciation instead, which we model for you.

Is there any state subsidy for Delhi NCR homeowners? +

In some NCR states, a limited additional state top-up exists on top of the central CFA; because it changes periodically, our engineers confirm the current slab for your city during the free audit before you commit.

Browse the full Knowledge Base →
CLIENT STORIES

Homeowners who made the smart switch.

Experiences shared by our customers.

★★★★★

“Varka delivered our 12kW Gurgaon plant in 21 days, including all DISCOM paperwork. Generation has matched the 3D simulation at 99.2%.”

R
Rahul Malhotra Gurgaon 12kW Solar
★★★★★

“The 45kW rooftop on our factory has cut our grid bill by 78%. Their team handled accelerated depreciation documentation too.”

M
Meera Krishnan Noida 45kW Solar
★★★★★

“Clean installation, professional engineers. Net metering took a bit longer than promised but support stayed with us throughout.”

A
Aman Verma Delhi 6kW Solar
FREE SITE AUDIT & SUBSIDY ESTIMATE

Your roof is earning nothing.
Let’s change that.

Get a free engineering audit, a site-specific savings estimate, and the maximum MNRE subsidy you qualify for. Timelines depend on site assessment. No obligation.