The Deployment Timeline.
Our disciplined engineering phase-gates ensure 100% success from audit to grid-sync.
Technical Audit
Site visit, structural check, shadow mapping, and load analysis. (Day 1-3)
Liaison & Approval
DISCOM Net-metering application and MNRE subsidy portal registration. (Day 4-14)
Deployment
Physical installation of structures, modules, and inverters. (Day 15-20)
Grid Sync
Bidirectional meter installation and commissioning. (Day 21-45)
Questions, Answered.
Straight answers from our engineers - no jargon, no sales speak.
What is the payback period for a 10kW system? +
Typically, a 10kW system recovers its cost in 3.4 to 3.8 years factoring in subsidies and current tariffs.
How do you manage 11kV grid synchronization? +
Our in-house team handles HT Load Approvals and CEIG Certification for seamless grid connectivity.
Why are structures certified for 180 km/h winds? +
NCR weather requires heavy-duty HDG structures to ensure a 25-year structural lifecycle.
How much roof space is required per kW? +
Typically 80-100 sq.ft. of shadow-free area is required per kW of solar installation.
What is included in Varka Care+ AMC? +
Quarterly thermal audits, DI-water cleaning, string-level monitoring, and 24-hour response time.
What is the timeline for subsidy disbursement? +
Subsidy (up to ₹78,000) is typically released by MNRE within 30-45 business days post-commissioning.
Homeowners who made the smart switch.
Experiences shared by our customers.
“Varka delivered our 12kW Gurgaon plant in 21 days, including all DISCOM paperwork. Generation has matched the 3D simulation at 99.2%.”
“The 45kW rooftop on our factory has cut our grid bill by 78%. Their team handled accelerated depreciation documentation too.”
“Clean installation, professional engineers. Net metering took a bit longer than promised but support stayed with us throughout.”