PROJECT LIFECYCLE

The Deployment Timeline.

Our disciplined engineering phase-gates ensure 100% success from audit to grid-sync.

PHASE 01

Technical Audit

Site visit, structural check, shadow mapping, and load analysis. (Day 1-3)

PHASE 02

Liaison & Approval

DISCOM Net-metering application and MNRE subsidy portal registration. (Day 4-14)

PHASE 03

Deployment

Physical installation of structures, modules, and inverters. (Day 15-20)

PHASE 04

Grid Sync

Bidirectional meter installation and commissioning. (Day 21-45)

MNRE-Listed Channel Partner Central subsidy, end to end
Project updates in one place Customer portal and support
25-Year Module Warranty Tier-1 hardware only
24-Hour Response Protocol Service, app-monitored
QUICK ANSWERS

Questions, Answered.

Straight answers from our engineers - no jargon, no sales speak.

What is the payback period for a 10kW system? +

Typically, a 10kW system recovers its cost in 3.4 to 3.8 years factoring in subsidies and current tariffs.

How do you manage 11kV grid synchronization? +

Our in-house team handles HT Load Approvals and CEIG Certification for seamless grid connectivity.

Why are structures certified for 180 km/h winds? +

NCR weather requires heavy-duty HDG structures to ensure a 25-year structural lifecycle.

How much roof space is required per kW? +

Typically 80-100 sq.ft. of shadow-free area is required per kW of solar installation.

What is included in Varka Care+ AMC? +

Quarterly thermal audits, DI-water cleaning, string-level monitoring, and 24-hour response time.

What is the timeline for subsidy disbursement? +

Subsidy (up to ₹78,000) is typically released by MNRE within 30-45 business days post-commissioning.

Browse the full Knowledge Base →
CLIENT STORIES

Homeowners who made the smart switch.

Experiences shared by our customers.

★★★★★

“Varka delivered our 12kW Gurgaon plant in 21 days, including all DISCOM paperwork. Generation has matched the 3D simulation at 99.2%.”

R
Rahul Malhotra Gurgaon 12kW Solar
★★★★★

“The 45kW rooftop on our factory has cut our grid bill by 78%. Their team handled accelerated depreciation documentation too.”

M
Meera Krishnan Noida 45kW Solar
★★★★★

“Clean installation, professional engineers. Net metering took a bit longer than promised but support stayed with us throughout.”

A
Aman Verma Delhi 6kW Solar
FREE SITE AUDIT & SUBSIDY ESTIMATE

Your roof is earning nothing.
Let’s change that.

Get a free engineering audit, a site-specific savings estimate, and the maximum MNRE subsidy you qualify for. Timelines depend on site assessment. No obligation.