PM Surya Ghar Empanelled · Up to ₹78,000 Direct Bank Subsidy (PVVNL Desk)
DELHI-NCR ROOFTOP SHOWROOM

Select your city

Personalize local DISCOM net-metering guidance across packages and calculators. Choosing a city never opens a form.

Karnataka · KA · 4.8-5.6 kWh/m²/day

Rooftop Solar in Karnataka

Residential & commercial rooftop solar systems sized by your roof area, shadow analysis and monthly consumption. Varka Solar delivers it across Karnataka with local squads and full BESCOM / MESCOM / HESCOM / GESCOM / CESC Mysore paperwork.

4.8-5.6 kWh/m²/daySolar Irradiance
BESCOM / MESCOM / HESCOM / GESCOM / CESC MysoreDISCOM
9+Districts Covered
₹78,000Max Subsidy

Rooftop Solar in Karnataka

Karnataka averages 4.8-5.6 kWh/m²/day of daily solar irradiance and is served by BESCOM / MESCOM / HESCOM / GESCOM / CESC Mysore. That combination keeps solar paybacks in the 3-5 year range for most residential systems — before factoring in the PM Surya Ghar subsidy of up to ₹78,000.

  • In-house squads: no subcontracting — our engineers install every system.
  • DISCOM & subsidy: net metering, approvals and PM Surya Ghar handled end to end.
  • Tier-1 hardware: TOPCon modules, industrial inverters, HDG structures.
  • 25-year warranty: performance cover plus remote telemetry on every plant.

Frequently Asked Questions

How much roof area is needed for a 3kW solar system?

About 200-240 sq ft is enough for a 3kW system with 550Wp panels. A 5kW system needs roughly 320-380 sq ft.

Can rooftop solar run during power cuts?

Standard grid-tied systems shut off during outages for safety. With a hybrid inverter + battery backup, essential loads keep running.

What is the payback period for rooftop solar?

With PM Surya Ghar subsidy and net metering, most residential systems pay back in 3-5 years and last 25+ years.

What is the PM Surya Ghar subsidy in Karnataka?

Up to ₹78,000 for residential systems (₹30,000 up to 2kW, ₹60,000 for 2-3kW, ₹78,000 for 3-10kW), credited directly to your bank account. Varka files the complete application with BESCOM / MESCOM / HESCOM / GESCOM / CESC Mysore.

How fast is installation in Karnataka?

Residential projects complete in 7-15 working days; commercial plants up to 100kW in 30-45 days, depending on BESCOM / MESCOM / HESCOM / GESCOM / CESC Mysore approval timelines.

Rooftop Solar in Karnataka

Free survey, fixed quote and full DISCOM paperwork — within 48 hours.

60-Second Estimate