PM Surya Ghar Empanelled · Up to ₹78,000 Direct Bank Subsidy (PVVNL Desk)
DELHI-NCR ROOFTOP SHOWROOM

Select your city

Personalize local DISCOM net-metering guidance across packages and calculators. Choosing a city never opens a form.

West Bengal · WB · 4.4-4.9 kWh/m²/day

Solar Panel Installation in West Bengal

End-to-end solar installation by certified engineers - site survey, design, DISCOM approval, installation and commissioning. Varka Solar delivers it across West Bengal with local squads and full WBSEDCL + CESC (Kolkata) paperwork.

4.4-4.9 kWh/m²/daySolar Irradiance
WBSEDCL + CESC (Kolkata)DISCOM
10+Districts Covered
₹78,000Max Subsidy

Solar Installation in West Bengal

West Bengal averages 4.4-4.9 kWh/m²/day of daily solar irradiance and is served by WBSEDCL + CESC (Kolkata). That combination keeps solar paybacks in the 3-5 year range for most residential systems — before factoring in the PM Surya Ghar subsidy of up to ₹78,000.

  • In-house squads: no subcontracting — our engineers install every system.
  • DISCOM & subsidy: net metering, approvals and PM Surya Ghar handled end to end.
  • Tier-1 hardware: TOPCon modules, industrial inverters, HDG structures.
  • 25-year warranty: performance cover plus remote telemetry on every plant.

Frequently Asked Questions

How long does a solar installation take?

A standard rooftop installation completes in 7-15 working days after survey and approval, depending on system size and DISCOM timeline.

Which solar panels does Varka install?

We install Tier-1 mono PERC and TOPCon panels (440Wp-585Wp) with 25-30 year performance warranty from leading brands.

Do you handle DISCOM approvals and net metering?

Yes - our team manages the complete DISCOM application, inspection and net metering process for you.

What is the PM Surya Ghar subsidy in West Bengal?

Up to ₹78,000 for residential systems (₹30,000 up to 2kW, ₹60,000 for 2-3kW, ₹78,000 for 3-10kW), credited directly to your bank account. Varka files the complete application with WBSEDCL + CESC (Kolkata).

How fast is installation in West Bengal?

Residential projects complete in 7-15 working days; commercial plants up to 100kW in 30-45 days, depending on WBSEDCL + CESC (Kolkata) approval timelines.

Solar Installation in West Bengal

Free survey, fixed quote and full DISCOM paperwork — within 48 hours.

60-Second Estimate