PM Surya Ghar Empanelled · Up to ₹78,000 Direct Bank Subsidy (PVVNL Desk)
DELHI-NCR ROOFTOP SHOWROOM

Select your city

Personalize local DISCOM net-metering guidance across packages and calculators. Choosing a city never opens a form.

North 24 Parganas · West Bengal · WB

Solar Panel Installation in Bongaon, West Bengal

Looking for the best solar company in Bongaon? Varka Solar installs rooftop, commercial and industrial systems across Bongaon with local engineers and end-to-end DISCOM and subsidy management.

0Areas Covered
1Pincodes Served
4.4-4.9 kWh/m²/daySolar Irradiance
WBSEDCL + CESC (Kolkata)DISCOM

Solar in Bongaon

Bongaon enjoys 4.4-4.9 kWh/m²/day daily solar irradiance with WBSEDCL + CESC (Kolkata) as the local utility — ideal conditions for rooftop solar payback in 3-5 years. Varka Solar's local team covers the full district.

We size systems from your last 12 months of bills, then handle the DISCOM application, net metering and PM Surya Ghar subsidy from start to finish. Most Bongaon installations complete within 7-15 working days.

Nearby Cities

Also served by the North 24 Parganas team.

Pincodes Served in Bongaon

743235

Frequently Asked Questions

What is the solar subsidy in West Bengal?

Under PM Surya Ghar Muft Bijli Yojana, residential consumers get up to ₹30,000 for systems up to 2kW, ₹60,000 for 2-3kW, and ₹78,000 for 3-10kW, credited directly to their bank account. Varka Solar completes the full WBSEDCL + CESC (Kolkata) application for you.

How much does a solar system cost in Bongaon?

A 3kW rooftop system costs roughly ₹1.6-2.1 lakh before subsidy in Bongaon, and about ₹1.0-1.5 lakh after the PM Surya Ghar subsidy. Commercial and industrial systems start around ₹45,000 per kW.

How long does solar installation take in Bongaon?

Residential rooftops complete in 7-15 working days after site survey and WBSEDCL + CESC (Kolkata) approval. Commercial projects up to 100kW commission in 30-45 days.

Does Varka Solar handle net metering in West Bengal?

Yes. Our team manages the complete WBSEDCL + CESC (Kolkata) net metering application, meter installation and inspection process for every project in West Bengal.

Get solar installed in Bongaon

Free survey, fixed quote, full DISCOM paperwork — within 48 hours.

60-Second Estimate